Butte Silver Bow Pool

Project Details
  • Date Completed:
  • Location:Butte, MT
  • Bodies of Water:1
  • Under Construction
The 14,000 sq. ft. aquatic center is expected to be completed in spring/summer 2018 and will include zero beach entry, four 25-yard lap lanes, two waterslides, a large lazy river, play structure, various spray features, monkey swings and five stair entries.