DOD-USAF Air Force Academy

Project Details
  • Date Completed:September 2016
  • Location:Colorado Springs, CO
  • Bodies of Water:1
  • Completed

This facility was already existing and had an olympic size swimming pool. Renovations made by TPC included removing 2 existing bulkheads and installing two new Myrtha bulkheads with automation. Bulkheads were completed with starting blocks and timing system RJP’s.